US Bridges

SR 2019 over Over Quaker Run

Fair

Northumberland County, Pennsylvania · Brady ST Village Brady · Structure no. 000000000029210

Built
1913
112 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
23 ft
1 main span
Daily traffic
1,018
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2019 over Over Quaker Run is a steel stringer/multi-beam or girder carrying SR 2019 over Over Quaker Run in Northumberland County, Pennsylvania. It was built in 1913, so it is 112 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,018 vehicles a day, roughly 1% of them trucks, projected to reach 787 by 2032. The structure is 23 ft (7 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 2019
CrossesOver Quaker Run
LocationBrady ST Village Brady
RouteState Highway 0
Coordinates40.78533, -76.51467
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length23 ft (7 m)
Longest span22 ft (6.7 m)
Deck width30 ft (9 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,018 (2024)
Projected traffic787 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$86,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2019 over Over Quaker Run built?

It was built in 1913, making it 112 years old in 2025.

What condition is SR 2019 over Over Quaker Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does SR 2019 over Over Quaker Run carry?

About 1,018 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 2019 over Over Quaker Run?

The structure is 23 ft (7 m) long with a longest span of 22 ft (6.7 m) and a deck 30 ft wide.

Who owns SR 2019 over Over Quaker Run?

It is owned by the State Highway Agency.