US Bridges

SR4003(LR 48061) over Indian Creek

Good

Northampton County, Pennsylvania · 2 Mi.N.Of Pennsville · Structure no. 000000000047979

Built
2013
12 years old
Condition
Good
inspected July 2023
Type
Arch - Deck
Concrete
Length
36 ft
1 main span
Daily traffic
883
2024 count
Owner
State
State Highway Agency

About this bridge

SR4003(LR 48061) over Indian Creek is a concrete arch - deck carrying SR4003(LR 48061) over Indian Creek in Northampton County, Pennsylvania. It was built in 2013, so it is 12 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 883 vehicles a day, projected to reach 832 by 2032. The structure is 36 ft (11 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSR4003(LR 48061)
CrossesIndian Creek
Location2 Mi.N.Of Pennsville
RouteState Highway 0
Coordinates40.77071, -75.51215
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.9 US tons
Inventory rating50 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length36 ft (11 m)
Longest span36 ft (11 m)
Deck width30 ft (9.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic883 (2024)
Projected traffic832 by 2032
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR4003(LR 48061) over Indian Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR4003(LR 48061) over Indian Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does SR4003(LR 48061) over Indian Creek carry?

About 883 vehicles per day (2024 count).

How long is SR4003(LR 48061) over Indian Creek?

The structure is 36 ft (11 m) long with a longest span of 36 ft (11 m) and a deck 30 ft wide.

Who owns SR4003(LR 48061) over Indian Creek?

It is owned by the State Highway Agency.