US Bridges

I-80 EB over Trib Mauses CR & SR 3007

Fair

Montour County, Pennsylvania · 2.1 Mi. W Danville Exit · Structure no. 000000000028345

Built
1963
62 years old, rebuilt 1988
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
136 ft
2 main spans
Daily traffic
14,014
2024 count
Owner
State
State Highway Agency

About this bridge

I-80 EB over Trib Mauses CR & SR 3007 is a prestressed concrete box beam or girders - multiple carrying I-80 EB over Trib Mauses CR & SR 3007 in Montour County, Pennsylvania. It was built in 1963 and reconstructed in 1988, so it is 62 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,014 vehicles a day, roughly 38% of them trucks, projected to reach 19,254 by 2032. The structure is 136 ft (41.5 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-80 EB
CrossesTrib Mauses CR & SR 3007
Location2.1 Mi. W Danville Exit
RouteInterstate 80
Coordinates40.9891, -76.68301
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 23 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating32 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length136 ft (41.5 m)
Longest span65 ft (19.8 m)
Deck width46 ft (13.9 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,014 (2024)
Projected traffic19,254 by 2032
Trucks38%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-80 EB over Trib Mauses CR & SR 3007 built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1988.

What condition is I-80 EB over Trib Mauses CR & SR 3007 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I-80 EB over Trib Mauses CR & SR 3007 carry?

About 14,014 vehicles per day (2024 count), of which roughly 38% are trucks.

How long is I-80 EB over Trib Mauses CR & SR 3007?

The structure is 136 ft (41.5 m) long with a longest span of 65 ft (19.8 m) and a deck 46 ft wide.

Who owns I-80 EB over Trib Mauses CR & SR 3007?

It is owned by the State Highway Agency.