Sterling Drive over W Br Neshaminy CR
FairMontgomery County, Pennsylvania · 0.4MI W of SR309 3032-F4 · Structure no. 000000000057506
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected March 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 1,000
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Sterling Drive over W Br Neshaminy CR is a prestressed concrete tee beam carrying Sterling Drive over W Br Neshaminy CR in Montgomery County, Pennsylvania. It was built in 2004, so it is 21 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,500 by 2040. The structure is 42 ft (12.8 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sterling Drive over W Br Neshaminy CR built?
It was built in 2004, making it 21 years old in 2025.
What condition is Sterling Drive over W Br Neshaminy CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Sterling Drive over W Br Neshaminy CR carry?
About 1,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Sterling Drive over W Br Neshaminy CR?
The structure is 42 ft (12.8 m) long with a longest span of 41 ft (12.5 m) and a deck 46 ft wide.
Who owns Sterling Drive over W Br Neshaminy CR?
It is owned by the Town or Township Highway Agency.