Ashmead Road over Tookany Creek
GoodMontgomery County, Pennsylvania · 1.0 MI NW SR 232 3481-D2 · Structure no. 000000000057442
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 12,035
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Ashmead Road over Tookany Creek is a prestressed concrete box beam or girders - multiple carrying Ashmead Road over Tookany Creek in Montgomery County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,035 vehicles a day, roughly 1% of them trucks, projected to reach 15,000 by 2037. The structure is 58 ft (17.7 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ashmead Road over Tookany Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is Ashmead Road over Tookany Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Ashmead Road over Tookany Creek carry?
About 12,035 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is Ashmead Road over Tookany Creek?
The structure is 58 ft (17.7 m) long with a longest span of 57 ft (17.4 m) and a deck 58 ft wide.
Who owns Ashmead Road over Tookany Creek?
It is owned by the Town or Township Highway Agency.