Store Road T-403 over Branch of Skippack Creek
FairMontgomery County, Pennsylvania · 1.13 MI NE SR-73 3142-K3 · Structure no. 000000000028072
- Built
- 1969
- 56 years old, rebuilt 2015
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 240
- 2012 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Store Road T-403 over Branch of Skippack Creek is a prestressed concrete box beam or girders - multiple carrying Store Road T-403 over Branch of Skippack Creek in Montgomery County, Pennsylvania. It was built in 1969 and reconstructed in 2015, so it is 56 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 240 vehicles a day, projected to reach 278 by 2032. The structure is 27 ft (8.2 m) long and 21 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Store Road T-403 over Branch of Skippack Creek built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2015.
What condition is Store Road T-403 over Branch of Skippack Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Store Road T-403 over Branch of Skippack Creek carry?
About 240 vehicles per day (2012 count).
How long is Store Road T-403 over Branch of Skippack Creek?
The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 21 ft wide.
Who owns Store Road T-403 over Branch of Skippack Creek?
It is owned by the Town or Township Highway Agency.