US Bridges

New Second Street over Branch Tacony Creek

Fair

Montgomery County, Pennsylvania · Cheltenham 3371B10 · Structure no. 000000000027680

Built
1938
87 years old
Condition
Fair
inspected June 2024
Type
Tee Beam
Concrete
Length
26 ft
1 main span
Daily traffic
6,088
2024 count
Owner
State
State Highway Agency

About this bridge

New Second Street over Branch Tacony Creek is a concrete tee beam carrying New Second Street over Branch Tacony Creek in Montgomery County, Pennsylvania. It was built in 1938, so it is 87 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,088 vehicles a day, roughly 4% of them trucks, projected to reach 8,362 by 2032. The structure is 26 ft (7.9 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNew Second Street
CrossesBranch Tacony Creek
LocationCheltenham 3371B10
RouteState Highway 0
Coordinates40.0629, -75.11709
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating61.9 US tons
Inventory rating37 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,088 (2024)
Projected traffic8,362 by 2032
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$224,000
NavigationNo navigation control on waterway

Frequently asked questions

When was New Second Street over Branch Tacony Creek built?

It was built in 1938, making it 87 years old in 2025.

What condition is New Second Street over Branch Tacony Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does New Second Street over Branch Tacony Creek carry?

About 6,088 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is New Second Street over Branch Tacony Creek?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 33 ft wide.

Who owns New Second Street over Branch Tacony Creek?

It is owned by the State Highway Agency.