US Bridges

Mid-County Exwy.Nb over Chemical Road / 3368-C5

Fair

Montgomery County, Pennsylvania · Plymouth Township 29G11 · Structure no. 000000000027483

Built
1974
51 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
196 ft
1 main span
Daily traffic
52,298
2024 count
Owner
State
State Highway Agency

About this bridge

Mid-County Exwy.Nb over Chemical Road / 3368-C5 is a steel stringer/multi-beam or girder carrying Mid-County Exwy.Nb over Chemical Road / 3368-C5 in Montgomery County, Pennsylvania. It was built in 1974, so it is 51 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 52,298 vehicles a day, roughly 10% of them trucks, projected to reach 62,212 by 2032. The structure is 196 ft (59.7 m) long and 56 ft wide.

CarriesMid-County Exwy.Nb
CrossesChemical Road / 3368-C5
LocationPlymouth Township 29G11
RouteInterstate 476
Coordinates40.09922, -75.29486
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69 US tons
Inventory rating41 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20 + Mod
Structure length196 ft (59.7 m)
Longest span111 ft (33.8 m)
Deck width56 ft (17.1 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic52,298 (2024)
Projected traffic62,212 by 2032
Trucks10%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mid-County Exwy.Nb over Chemical Road / 3368-C5 built?

It was built in 1974, making it 51 years old in 2025.

What condition is Mid-County Exwy.Nb over Chemical Road / 3368-C5 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Mid-County Exwy.Nb over Chemical Road / 3368-C5 carry?

About 52,298 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Mid-County Exwy.Nb over Chemical Road / 3368-C5?

The structure is 196 ft (59.7 m) long with a longest span of 111 ft (33.8 m) and a deck 56 ft wide.

Who owns Mid-County Exwy.Nb over Chemical Road / 3368-C5?

It is owned by the State Highway Agency.