SR 2030 (lr 776) over I-80 (lr 794)
GoodMonroe County, Pennsylvania · I-80WB Off Ramp to Pa 611 · Structure no. 000000000056045
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 205 ft
- 2 main spans
- Daily traffic
- 1,048
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2030 (lr 776) over I-80 (lr 794) is a prestressed concrete stringer/multi-beam or girder carrying SR 2030 (lr 776) over I-80 (lr 794) in Monroe County, Pennsylvania. It was built in 2018, so it is 7 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,048 vehicles a day, roughly 9% of them trucks, projected to reach 1,612 by 2039. The structure is 205 ft (62.5 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2030 (lr 776) over I-80 (lr 794) built?
It was built in 2018, making it 7 years old in 2025.
What condition is SR 2030 (lr 776) over I-80 (lr 794) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2021.
How much traffic does SR 2030 (lr 776) over I-80 (lr 794) carry?
About 1,048 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is SR 2030 (lr 776) over I-80 (lr 794)?
The structure is 205 ft (62.5 m) long with a longest span of 109 ft (33.2 m) and a deck 38 ft wide.
Who owns SR 2030 (lr 776) over I-80 (lr 794)?
It is owned by the State Highway Agency.