US Bridges

On Tsr 328 over Musser Run

Good

Mifflin County, Pennsylvania · 3 MI SE Mcveytown · Structure no. 000000000048027

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
24 ft
1 main span
Daily traffic
426
2024 count
Owner
State
State Highway Agency

About this bridge

On Tsr 328 over Musser Run is a concrete culvert carrying On Tsr 328 over Musser Run in Mifflin County, Pennsylvania. It was built in 2013, so it is 12 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 426 vehicles a day, roughly 8% of them trucks, projected to reach 419 by 2044. The structure is 24 ft (7.3 m) long and 27 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesOn Tsr 328
CrossesMusser Run
Location3 MI SE Mcveytown
RouteState Highway 0
Coordinates40.47456, -77.81064
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating37.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length24 ft (7.3 m)
Longest span24 ft (7.3 m)
Deck width27 ft (8.2 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic426 (2024)
Projected traffic419 by 2044
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was On Tsr 328 over Musser Run built?

It was built in 2013, making it 12 years old in 2025.

What condition is On Tsr 328 over Musser Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does On Tsr 328 over Musser Run carry?

About 426 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is On Tsr 328 over Musser Run?

The structure is 24 ft (7.3 m) long with a longest span of 24 ft (7.3 m) and a deck 27 ft wide.

Who owns On Tsr 328 over Musser Run?

It is owned by the State Highway Agency.