SR 322-US 322 over SR 4001 and Tea Creek
GoodMifflin County, Pennsylvania · 1 MI N Reedsville · Structure no. 000000000040308
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 439 ft
- 4 main spans
- Daily traffic
- 8,666
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 322-US 322 over SR 4001 and Tea Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 322-US 322 over SR 4001 and Tea Creek in Mifflin County, Pennsylvania. It was built in 1998, so it is 27 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,666 vehicles a day, roughly 21% of them trucks, projected to reach 8,524 by 2044. The structure is 439 ft (133.8 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 322-US 322 over SR 4001 and Tea Creek built?
It was built in 1998, making it 27 years old in 2025.
What condition is SR 322-US 322 over SR 4001 and Tea Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does SR 322-US 322 over SR 4001 and Tea Creek carry?
About 8,666 vehicles per day (2024 count), of which roughly 21% are trucks.
How long is SR 322-US 322 over SR 4001 and Tea Creek?
The structure is 439 ft (133.8 m) long with a longest span of 123 ft (37.5 m) and a deck 44 ft wide.
Who owns SR 322-US 322 over SR 4001 and Tea Creek?
It is owned by the State Highway Agency.