SR 80 WB over Over T998 Centertown Rd.
FairMercer County, Pennsylvania · Wolf Creek Township · Structure no. 000000000040966
- Built
- 1965
- 60 years old, rebuilt 2000
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 12,803
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 80 WB over Over T998 Centertown Rd. is a prestressed concrete box beam or girders - multiple carrying SR 80 WB over Over T998 Centertown Rd. in Mercer County, Pennsylvania. It was built in 1965 and reconstructed in 2000, so it is 60 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,803 vehicles a day, roughly 40% of them trucks, projected to reach 16,630 by 2032. The structure is 33 ft (10.1 m) long and 45 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 80 WB over Over T998 Centertown Rd. built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2000.
What condition is SR 80 WB over Over T998 Centertown Rd. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does SR 80 WB over Over T998 Centertown Rd. carry?
About 12,803 vehicles per day (2024 count), of which roughly 40% are trucks.
How long is SR 80 WB over Over T998 Centertown Rd.?
The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 45 ft wide.
Who owns SR 80 WB over Over T998 Centertown Rd.?
It is owned by the State Highway Agency.