SR 3030 Budd ST over Over Shenango River
FairMercer County, Pennsylvania · City of Sharon · Structure no. 000000000026019
- Built
- 1965
- 60 years old, rebuilt 1999
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 185 ft
- 2 main spans
- Daily traffic
- 3,501
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 3030 Budd ST over Over Shenango River is a prestressed concrete box beam or girders - multiple carrying SR 3030 Budd ST over Over Shenango River in Mercer County, Pennsylvania. It was built in 1965 and reconstructed in 1999, so it is 60 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,501 vehicles a day, roughly 5% of them trucks, projected to reach 5,868 by 2032. The structure is 185 ft (56.4 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 3030 Budd ST over Over Shenango River built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1999.
What condition is SR 3030 Budd ST over Over Shenango River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 3030 Budd ST over Over Shenango River carry?
About 3,501 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is SR 3030 Budd ST over Over Shenango River?
The structure is 185 ft (56.4 m) long with a longest span of 92 ft (28 m) and a deck 49 ft wide.
Who owns SR 3030 Budd ST over Over Shenango River?
It is owned by the State Highway Agency.