US Bridges

SR 80 EB over Over SR 19 Nb/Sb Perry

Fair

Mercer County, Pennsylvania · East Lackawannock Twp. · Structure no. 000000000025791

Built
1965
60 years old, rebuilt 1993
Condition
Fair
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
144 ft
3 main spans
Daily traffic
12,992
2024 count
Owner
State
State Highway Agency

About this bridge

SR 80 EB over Over SR 19 Nb/Sb Perry is a prestressed concrete continuous box beam or girders - multiple carrying SR 80 EB over Over SR 19 Nb/Sb Perry in Mercer County, Pennsylvania. It was built in 1965 and reconstructed in 1993, so it is 60 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,992 vehicles a day, roughly 46% of them trucks, projected to reach 17,657 by 2032. The structure is 144 ft (43.9 m) long and 46 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesSR 80 EB
CrossesOver SR 19 Nb/Sb Perry
LocationEast Lackawannock Twp.
RouteInterstate 80
Coordinates41.19274, -80.24088
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating102 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length144 ft (43.9 m)
Longest span72 ft (21.9 m)
Deck width46 ft (13.9 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,992 (2024)
Projected traffic17,657 by 2032
Trucks46%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 80 EB over Over SR 19 Nb/Sb Perry built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1993.

What condition is SR 80 EB over Over SR 19 Nb/Sb Perry in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does SR 80 EB over Over SR 19 Nb/Sb Perry carry?

About 12,992 vehicles per day (2024 count), of which roughly 46% are trucks.

How long is SR 80 EB over Over SR 19 Nb/Sb Perry?

The structure is 144 ft (43.9 m) long with a longest span of 72 ft (21.9 m) and a deck 46 ft wide.

Who owns SR 80 EB over Over SR 19 Nb/Sb Perry?

It is owned by the State Highway Agency.