SR 80 EB over Over SR 3007 Mrcr-Plski
FairMercer County, Pennsylvania · East Lackawannock Twp. · Structure no. 000000000025785
- Built
- 1965
- 60 years old, rebuilt 1993
- Condition
- Fair
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 121 ft
- 3 main spans
- Daily traffic
- 12,282
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 80 EB over Over SR 3007 Mrcr-Plski is a prestressed concrete box beam or girders - multiple carrying SR 80 EB over Over SR 3007 Mrcr-Plski in Mercer County, Pennsylvania. It was built in 1965 and reconstructed in 1993, so it is 60 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,282 vehicles a day, roughly 45% of them trucks, projected to reach 17,657 by 2032. The structure is 121 ft (36.9 m) long and 46 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 80 EB over Over SR 3007 Mrcr-Plski built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1993.
What condition is SR 80 EB over Over SR 3007 Mrcr-Plski in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does SR 80 EB over Over SR 3007 Mrcr-Plski carry?
About 12,282 vehicles per day (2024 count), of which roughly 45% are trucks.
How long is SR 80 EB over Over SR 3007 Mrcr-Plski?
The structure is 121 ft (36.9 m) long with a longest span of 43 ft (13.1 m) and a deck 46 ft wide.
Who owns SR 80 EB over Over SR 3007 Mrcr-Plski?
It is owned by the State Highway Agency.