SR 79 SB over Over SR 2017 N.Foster RD
FairMercer County, Pennsylvania · Jackson Township · Structure no. 000000000025750
- Built
- 1965
- 60 years old, rebuilt 1988
- Condition
- Fair
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 8,934
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 79 SB over Over SR 2017 N.Foster RD is a prestressed concrete box beam or girders - multiple carrying SR 79 SB over Over SR 2017 N.Foster RD in Mercer County, Pennsylvania. It was built in 1965 and reconstructed in 1988, so it is 60 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,934 vehicles a day, roughly 22% of them trucks, projected to reach 11,306 by 2032. The structure is 110 ft (33.5 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 79 SB over Over SR 2017 N.Foster RD built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1988.
What condition is SR 79 SB over Over SR 2017 N.Foster RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SR 79 SB over Over SR 2017 N.Foster RD carry?
About 8,934 vehicles per day (2024 count), of which roughly 22% are trucks.
How long is SR 79 SB over Over SR 2017 N.Foster RD?
The structure is 110 ft (33.5 m) long with a longest span of 42 ft (12.8 m) and a deck 46 ft wide.
Who owns SR 79 SB over Over SR 2017 N.Foster RD?
It is owned by the State Highway Agency.