US Bridges

SR 219-US 219 over Bolivar Run

Good

McKean County, Pennsylvania · Bradford Bypass · Structure no. 000000000044352

Built
2007
18 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
6,060
2024 count
Owner
State
State Highway Agency

About this bridge

SR 219-US 219 over Bolivar Run is a prestressed concrete box beam or girders - multiple carrying SR 219-US 219 over Bolivar Run in McKean County, Pennsylvania. It was built in 2007, so it is 18 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,060 vehicles a day, roughly 10% of them trucks, projected to reach 7,095 by 2044. The structure is 62 ft (18.9 m) long and 50 ft wide.

CarriesSR 219-US 219
CrossesBolivar Run
LocationBradford Bypass
RouteU.S. Route 219
Coordinates41.62506, -78.67609
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length62 ft (18.9 m)
Longest span60 ft (18.3 m)
Deck width50 ft (15.1 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,060 (2024)
Projected traffic7,095 by 2044
Trucks10%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 219-US 219 over Bolivar Run built?

It was built in 2007, making it 18 years old in 2025.

What condition is SR 219-US 219 over Bolivar Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SR 219-US 219 over Bolivar Run carry?

About 6,060 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is SR 219-US 219 over Bolivar Run?

The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 50 ft wide.

Who owns SR 219-US 219 over Bolivar Run?

It is owned by the State Highway Agency.