US Bridges

T-531 Bigley Ave over Bolivar Run

Fair

McKean County, Pennsylvania · 300 South of Bolivar DR · Structure no. 000000000040075

Built
1979
46 years old, rebuilt 2016
Condition
Fair
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
300
2018 count
Owner
Local
Other Local Agency

About this bridge

T-531 Bigley Ave over Bolivar Run is a prestressed concrete box beam or girders - multiple carrying T-531 Bigley Ave over Bolivar Run in McKean County, Pennsylvania. It was built in 1979 and reconstructed in 2016, so it is 46 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 300 vehicles a day, roughly 7% of them trucks, projected to reach 400 by 2038. The structure is 44 ft (13.4 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT-531 Bigley Ave
CrossesBolivar Run
Location300 South of Bolivar DR
RouteCity Street 0
Coordinates41.9741, -78.6433
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42 US tons
Inventory rating25 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span42 ft (12.8 m)
Deck width32 ft (9.8 m)
Roadway width22 ft (6.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2018)
Projected traffic400 by 2038
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T-531 Bigley Ave over Bolivar Run built?

It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2016.

What condition is T-531 Bigley Ave over Bolivar Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does T-531 Bigley Ave over Bolivar Run carry?

About 300 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is T-531 Bigley Ave over Bolivar Run?

The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 32 ft wide.

Who owns T-531 Bigley Ave over Bolivar Run?

It is owned by the Other Local Agency.