Kennedy Street over W Br Tunungwant Creek
GoodMcKean County, Pennsylvania · 100 Ft North of Miller ST · Structure no. 000000000025613
- Built
- 1955
- 70 years old, rebuilt 2011
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 85 ft
- 1 main span
- Daily traffic
- 800
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Kennedy Street over W Br Tunungwant Creek is a prestressed concrete box beam or girders - multiple carrying Kennedy Street over W Br Tunungwant Creek in McKean County, Pennsylvania. It was built in 1955 and reconstructed in 2011, so it is 70 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 800 vehicles a day, roughly 4% of them trucks, projected to reach 1,100 by 2038. The structure is 85 ft (25.9 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Kennedy Street over W Br Tunungwant Creek built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 2011.
What condition is Kennedy Street over W Br Tunungwant Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Kennedy Street over W Br Tunungwant Creek carry?
About 800 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is Kennedy Street over W Br Tunungwant Creek?
The structure is 85 ft (25.9 m) long with a longest span of 83 ft (25.3 m) and a deck 36 ft wide.
Who owns Kennedy Street over W Br Tunungwant Creek?
It is owned by the City or Municipal Highway Agency and maintained by the Town or Township Highway Agency.