SR15 NB over Over T-811 & Beck Run
GoodLycoming County, Pennsylvania · 1 Mile North Buttonwood · Structure no. 000000000040013
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 139 ft
- 1 main span
- Daily traffic
- 5,520
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR15 NB over Over T-811 & Beck Run is a prestressed concrete stringer/multi-beam or girder carrying SR15 NB over Over T-811 & Beck Run in Lycoming County, Pennsylvania. It was built in 1998, so it is 27 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,520 vehicles a day, roughly 26% of them trucks, projected to reach 8,061 by 2032. The structure is 139 ft (42.4 m) long and 45 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR15 NB over Over T-811 & Beck Run built?
It was built in 1998, making it 27 years old in 2025.
What condition is SR15 NB over Over T-811 & Beck Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does SR15 NB over Over T-811 & Beck Run carry?
About 5,520 vehicles per day (2024 count), of which roughly 26% are trucks.
How long is SR15 NB over Over T-811 & Beck Run?
The structure is 139 ft (42.4 m) long with a longest span of 135 ft (41.1 m) and a deck 45 ft wide.
Who owns SR15 NB over Over T-811 & Beck Run?
It is owned by the State Highway Agency.