US Bridges

T-322 Twp. Br. 343 over Antes Creek

Fair

Lycoming County, Pennsylvania · 0.9 Mi. W. of Antes Fort · Structure no. 000000000025117

Built
1989
36 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
108
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T-322 Twp. Br. 343 over Antes Creek is a prestressed concrete box beam or girders - multiple carrying T-322 Twp. Br. 343 over Antes Creek in Lycoming County, Pennsylvania. It was built in 1989, so it is 36 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 108 vehicles a day, roughly 2% of them trucks, projected to reach 167 by 2045. The structure is 62 ft (18.9 m) long and 25 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesT-322 Twp. Br. 343
CrossesAntes Creek
Location0.9 Mi. W. of Antes Fort
RouteCity Street 0
Coordinates41.18865, -77.24031
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating103.9 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length62 ft (18.9 m)
Longest span60 ft (18.3 m)
Deck width25 ft (7.5 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic108 (2023)
Projected traffic167 by 2045
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T-322 Twp. Br. 343 over Antes Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is T-322 Twp. Br. 343 over Antes Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does T-322 Twp. Br. 343 over Antes Creek carry?

About 108 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is T-322 Twp. Br. 343 over Antes Creek?

The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 25 ft wide.

Who owns T-322 Twp. Br. 343 over Antes Creek?

It is owned by the Town or Township Highway Agency.