US Bridges

SR 220 Sbl over Over Pine Creek

Good

Lycoming County, Pennsylvania · Clinton-Lycoming CO Line · Structure no. 000000000024680

Built
1968
57 years old, rebuilt 1998
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
422 ft
5 main spans
Daily traffic
8,540
2024 count
Owner
State
State Highway Agency

About this bridge

SR 220 Sbl over Over Pine Creek is a steel continuous stringer/multi-beam or girder carrying SR 220 Sbl over Over Pine Creek in Lycoming County, Pennsylvania. It was built in 1968 and reconstructed in 1998, so it is 57 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,540 vehicles a day, roughly 17% of them trucks, projected to reach 13,513 by 2032. The structure is 422 ft (128.6 m) long and 37 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 220 Sbl
CrossesOver Pine Creek
LocationClinton-Lycoming CO Line
RouteU.S. Route 220
Coordinates41.19833, -77.29368
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80 US tons
Inventory rating48 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length422 ft (128.6 m)
Longest span86 ft (26.2 m)
Deck width37 ft (11.4 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,540 (2024)
Projected traffic13,513 by 2032
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 220 Sbl over Over Pine Creek built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1998.

What condition is SR 220 Sbl over Over Pine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SR 220 Sbl over Over Pine Creek carry?

About 8,540 vehicles per day (2024 count), of which roughly 17% are trucks.

How long is SR 220 Sbl over Over Pine Creek?

The structure is 422 ft (128.6 m) long with a longest span of 86 ft (26.2 m) and a deck 37 ft wide.

Who owns SR 220 Sbl over Over Pine Creek?

It is owned by the State Highway Agency.