SR-0180 Wbl over Over Carpenters Run
GoodLycoming County, Pennsylvania · 1 MI N of Halls Station · Structure no. 000000000024658
- Built
- 1975
- 50 years old, rebuilt 2004
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 93 ft
- 1 main span
- Daily traffic
- 13,242
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR-0180 Wbl over Over Carpenters Run is a prestressed concrete stringer/multi-beam or girder carrying SR-0180 Wbl over Over Carpenters Run in Lycoming County, Pennsylvania. It was built in 1975 and reconstructed in 2004, so it is 50 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,242 vehicles a day, roughly 13% of them trucks, projected to reach 12,693 by 2032. The structure is 93 ft (28.3 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-0180 Wbl over Over Carpenters Run built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2004.
What condition is SR-0180 Wbl over Over Carpenters Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does SR-0180 Wbl over Over Carpenters Run carry?
About 13,242 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is SR-0180 Wbl over Over Carpenters Run?
The structure is 93 ft (28.3 m) long with a longest span of 88 ft (26.8 m) and a deck 43 ft wide.
Who owns SR-0180 Wbl over Over Carpenters Run?
It is owned by the State Highway Agency.