SR 0081 I-81 NB over SR 2039 & Gardner Creek
GoodLuzerne County, Pennsylvania · Laflin Boro over SR 2039 · Structure no. 000000000053652
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 170 ft
- 1 main span
- Daily traffic
- 32,046
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0081 I-81 NB over SR 2039 & Gardner Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 0081 I-81 NB over SR 2039 & Gardner Creek in Luzerne County, Pennsylvania. It was built in 2016, so it is 9 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 32,046 vehicles a day, roughly 20% of them trucks, projected to reach 34,851 by 2036. The structure is 170 ft (51.8 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0081 I-81 NB over SR 2039 & Gardner Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is SR 0081 I-81 NB over SR 2039 & Gardner Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SR 0081 I-81 NB over SR 2039 & Gardner Creek carry?
About 32,046 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is SR 0081 I-81 NB over SR 2039 & Gardner Creek?
The structure is 170 ft (51.8 m) long with a longest span of 170 ft (51.8 m) and a deck 70 ft wide.
Who owns SR 0081 I-81 NB over SR 2039 & Gardner Creek?
It is owned by the State Highway Agency.