US Bridges

SR 1059 Fedor RD over Harvey Creek

Good

Luzerne County, Pennsylvania · Lehman Twp 200 S TR 118 · Structure no. 000000000024043

Built
1997
28 years old
Condition
Good
inspected October 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
483
2024 count
Owner
State
State Highway Agency

About this bridge

SR 1059 Fedor RD over Harvey Creek is a prestressed concrete box beam or girders - multiple carrying SR 1059 Fedor RD over Harvey Creek in Luzerne County, Pennsylvania. It was built in 1997, so it is 28 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 483 vehicles a day, roughly 6% of them trucks, projected to reach 399 by 2032. The structure is 40 ft (12.2 m) long and 32 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesSR 1059 Fedor RD
CrossesHarvey Creek
LocationLehman Twp 200 S TR 118
RouteState Highway 0
Coordinates41.2925, -76.04845
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating86 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic483 (2024)
Projected traffic399 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 1059 Fedor RD over Harvey Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is SR 1059 Fedor RD over Harvey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does SR 1059 Fedor RD over Harvey Creek carry?

About 483 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SR 1059 Fedor RD over Harvey Creek?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 32 ft wide.

Who owns SR 1059 Fedor RD over Harvey Creek?

It is owned by the State Highway Agency.