SR 0115 TR 115 NB over SR 0081 I-81 NB & SB
PoorLuzerne County, Pennsylvania · Plains Twp over I-81NB&SB · Structure no. 000000000023805
- Built
- 1963
- 62 years old, rebuilt 1983
- Condition
- Poor
- inspected December 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 162 ft
- 2 main spans
- Daily traffic
- 14,137
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0115 TR 115 NB over SR 0081 I-81 NB & SB is a prestressed concrete stringer/multi-beam or girder carrying SR 0115 TR 115 NB over SR 0081 I-81 NB & SB in Luzerne County, Pennsylvania. It was built in 1963 and reconstructed in 1983, so it is 62 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 14,137 vehicles a day, roughly 6% of them trucks, projected to reach 12,521 by 2032. The structure is 162 ft (49.4 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0115 TR 115 NB over SR 0081 I-81 NB & SB built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1983.
What condition is SR 0115 TR 115 NB over SR 0081 I-81 NB & SB in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2022.
How much traffic does SR 0115 TR 115 NB over SR 0081 I-81 NB & SB carry?
About 14,137 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is SR 0115 TR 115 NB over SR 0081 I-81 NB & SB?
The structure is 162 ft (49.4 m) long with a longest span of 86 ft (26.2 m) and a deck 46 ft wide.
Who owns SR 0115 TR 115 NB over SR 0081 I-81 NB & SB?
It is owned by the State Highway Agency.