US Bridges

Woodside Ave over Squaw Run

Good

Lawrence County, Pennsylvania · 1/4 MI S of SR 2003 · Structure no. 000000000047920

Built
2013
12 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
33 ft
1 main span
Daily traffic
5,294
2024 count
Owner
State
State Highway Agency

About this bridge

Woodside Ave over Squaw Run is a prestressed concrete box beam or girders - multiple carrying Woodside Ave over Squaw Run in Lawrence County, Pennsylvania. It was built in 2013, so it is 12 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,294 vehicles a day, roughly 8% of them trucks, projected to reach 6,000 by 2034. The structure is 33 ft (10.1 m) long and 37 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesWoodside Ave
CrossesSquaw Run
Location1/4 MI S of SR 2003
RouteState Highway 65
Coordinates40.87629, -80.26348
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length33 ft (10.1 m)
Longest span31 ft (9.4 m)
Deck width37 ft (11.4 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,294 (2024)
Projected traffic6,000 by 2034
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Woodside Ave over Squaw Run built?

It was built in 2013, making it 12 years old in 2025.

What condition is Woodside Ave over Squaw Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Woodside Ave over Squaw Run carry?

About 5,294 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is Woodside Ave over Squaw Run?

The structure is 33 ft (10.1 m) long with a longest span of 31 ft (9.4 m) and a deck 37 ft wide.

Who owns Woodside Ave over Squaw Run?

It is owned by the State Highway Agency.