Poplar Street over West Cocalico Creek
GoodLancaster County, Pennsylvania · 0.5 MI NW Denver Boro · Structure no. 000000000053881
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 522
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Poplar Street over West Cocalico Creek is a prestressed concrete box beam or girders - multiple carrying Poplar Street over West Cocalico Creek in Lancaster County, Pennsylvania. It was built in 2017, so it is 8 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 522 vehicles a day, roughly 10% of them trucks, projected to reach 818 by 2032. The structure is 44 ft (13.4 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Poplar Street over West Cocalico Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is Poplar Street over West Cocalico Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Poplar Street over West Cocalico Creek carry?
About 522 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Poplar Street over West Cocalico Creek?
The structure is 44 ft (13.4 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.
Who owns Poplar Street over West Cocalico Creek?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).