Willow Rd; T-612 over Lr 1124 Incomplete RD
FairLancaster County, Pennsylvania · 1.2 MI E of Eden · Structure no. 000000000021496
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 245 ft
- 2 main spans
- Daily traffic
- 4,075
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Willow Rd; T-612 over Lr 1124 Incomplete RD is a steel continuous stringer/multi-beam or girder carrying Willow Rd; T-612 over Lr 1124 Incomplete RD in Lancaster County, Pennsylvania. It was built in 1975, so it is 50 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,075 vehicles a day, projected to reach 4,115 by 2032. The structure is 245 ft (74.7 m) long and 44 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Willow Rd; T-612 over Lr 1124 Incomplete RD built?
It was built in 1975, making it 50 years old in 2025.
What condition is Willow Rd; T-612 over Lr 1124 Incomplete RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Willow Rd; T-612 over Lr 1124 Incomplete RD carry?
About 4,075 vehicles per day (2024 count).
How long is Willow Rd; T-612 over Lr 1124 Incomplete RD?
The structure is 245 ft (74.7 m) long with a longest span of 85 ft (25.9 m) and a deck 44 ft wide.
Who owns Willow Rd; T-612 over Lr 1124 Incomplete RD?
It is owned by the State Highway Agency.