US Bridges

S.R. 4010 over Ackerly Creek

Good

Lackawanna County, Pennsylvania · 0.5 Miles East of T.R. 6 · Structure no. 000000000044080

Built
2006
19 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
570
2024 count
Owner
State
State Highway Agency

About this bridge

S.R. 4010 over Ackerly Creek is a prestressed concrete box beam or girders - multiple carrying S.R. 4010 over Ackerly Creek in Lackawanna County, Pennsylvania. It was built in 2006, so it is 19 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 570 vehicles a day, roughly 4% of them trucks, projected to reach 857 by 2032. The structure is 48 ft (14.6 m) long and 33 ft wide.

CarriesS.R. 4010
CrossesAckerly Creek
Location0.5 Miles East of T.R. 6
RouteState Highway 0
Coordinates41.51422, -75.71676
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating95 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length48 ft (14.6 m)
Longest span46 ft (14 m)
Deck width33 ft (10.2 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic570 (2024)
Projected traffic857 by 2032
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S.R. 4010 over Ackerly Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is S.R. 4010 over Ackerly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does S.R. 4010 over Ackerly Creek carry?

About 570 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is S.R. 4010 over Ackerly Creek?

The structure is 48 ft (14.6 m) long with a longest span of 46 ft (14 m) and a deck 33 ft wide.

Who owns S.R. 4010 over Ackerly Creek?

It is owned by the State Highway Agency.