SR 0380 I-380 SB over SR 0690 TR 690
GoodLackawanna County, Pennsylvania · Moscow Boro over TR 690 · Structure no. 000000000020593
- Built
- 1975
- 50 years old, rebuilt 2009
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 113 ft
- 3 main spans
- Daily traffic
- 12,049
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0380 I-380 SB over SR 0690 TR 690 is a prestressed concrete box beam or girders - multiple carrying SR 0380 I-380 SB over SR 0690 TR 690 in Lackawanna County, Pennsylvania. It was built in 1975 and reconstructed in 2009, so it is 50 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,049 vehicles a day, roughly 20% of them trucks, projected to reach 17,021 by 2032. The structure is 113 ft (34.4 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0380 I-380 SB over SR 0690 TR 690 built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2009.
What condition is SR 0380 I-380 SB over SR 0690 TR 690 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does SR 0380 I-380 SB over SR 0690 TR 690 carry?
About 12,049 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is SR 0380 I-380 SB over SR 0690 TR 690?
The structure is 113 ft (34.4 m) long with a longest span of 54 ft (16.5 m) and a deck 43 ft wide.
Who owns SR 0380 I-380 SB over SR 0690 TR 690?
It is owned by the State Highway Agency.