SR 8002 Ramp T over Horning Run
GoodJuniata County, Pennsylvania · Arch Rock Interchange · Structure no. 000000000042043
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 392
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 8002 Ramp T over Horning Run is a prestressed concrete box beam or girders - multiple carrying SR 8002 Ramp T over Horning Run in Juniata County, Pennsylvania. It was built in 2003, so it is 22 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 392 vehicles a day, roughly 20% of them trucks, projected to reach 411 by 2043. The structure is 58 ft (17.7 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 8002 Ramp T over Horning Run built?
It was built in 2003, making it 22 years old in 2025.
What condition is SR 8002 Ramp T over Horning Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SR 8002 Ramp T over Horning Run carry?
About 392 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is SR 8002 Ramp T over Horning Run?
The structure is 58 ft (17.7 m) long with a longest span of 58 ft (17.7 m) and a deck 36 ft wide.
Who owns SR 8002 Ramp T over Horning Run?
It is owned by the State Highway Agency.