T-359 Factory RD over East Licking Creek
FairJuniata County, Pennsylvania · 800 South of SR 4002 · Structure no. 000000000020340
- Built
- 1985
- 40 years old, rebuilt 2013
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 75
- 2014 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-359 Factory RD over East Licking Creek is a prestressed concrete slab carrying T-359 Factory RD over East Licking Creek in Juniata County, Pennsylvania. It was built in 1985 and reconstructed in 2013, so it is 40 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 5% of them trucks, projected to reach 106 by 2034. The structure is 31 ft (9.4 m) long and 19 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-359 Factory RD over East Licking Creek built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2013.
What condition is T-359 Factory RD over East Licking Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does T-359 Factory RD over East Licking Creek carry?
About 75 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is T-359 Factory RD over East Licking Creek?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 19 ft wide.
Who owns T-359 Factory RD over East Licking Creek?
It is owned by the Town or Township Highway Agency.