SR 850-PA 850 over Woodward Run
FairJuniata County, Pennsylvania · One Half MI S Reeds Gap · Structure no. 000000000020093
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 236
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 850-PA 850 over Woodward Run is a steel stringer/multi-beam or girder carrying SR 850-PA 850 over Woodward Run in Juniata County, Pennsylvania. It was built in 1955, so it is 70 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 236 vehicles a day, roughly 9% of them trucks, projected to reach 317 by 2043. The structure is 30 ft (9.1 m) long and 25 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 850-PA 850 over Woodward Run built?
It was built in 1955, making it 70 years old in 2025.
What condition is SR 850-PA 850 over Woodward Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR 850-PA 850 over Woodward Run carry?
About 236 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is SR 850-PA 850 over Woodward Run?
The structure is 30 ft (9.1 m) long with a longest span of 13 ft (4 m) and a deck 25 ft wide.
Who owns SR 850-PA 850 over Woodward Run?
It is owned by the State Highway Agency.