SR 2019 over Licking Creek
PoorHuntingdon County, Pennsylvania · 0.1 Mile South of Pa 103 · Structure no. 000000000018834
- Built
- 1930
- 95 years old, rebuilt 2010
- Condition
- Poor
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 28 ft
- 1 main span
- Daily traffic
- 334
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2019 over Licking Creek is a steel stringer/multi-beam or girder carrying SR 2019 over Licking Creek in Huntingdon County, Pennsylvania. It was built in 1930 and reconstructed in 2010, so it is 95 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 334 vehicles a day, roughly 18% of them trucks, projected to reach 301 by 2032. The structure is 28 ft (8.5 m) long and 24 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2019 over Licking Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 2010.
What condition is SR 2019 over Licking Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2023.
How much traffic does SR 2019 over Licking Creek carry?
About 334 vehicles per day (2024 count), of which roughly 18% are trucks.
How long is SR 2019 over Licking Creek?
The structure is 28 ft (8.5 m) long with a longest span of 25 ft (7.6 m) and a deck 24 ft wide.
Who owns SR 2019 over Licking Creek?
It is owned by the State Highway Agency.