US Bridges

Cito RD over Spring Run

Good

Fulton County, Pennsylvania · Webster Mills · Structure no. 000000000053821

Built
2018
7 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
39 ft
1 main span
Daily traffic
3,056
2024 count
Owner
State
State Highway Agency

About this bridge

Cito RD over Spring Run is a prestressed concrete box beam or girders - multiple carrying Cito RD over Spring Run in Fulton County, Pennsylvania. It was built in 2018, so it is 7 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,056 vehicles a day, roughly 3% of them trucks, projected to reach 3,126 by 2032. The structure is 39 ft (11.9 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCito RD
CrossesSpring Run
LocationWebster Mills
RouteState Highway 0
Coordinates39.85953, -78.03417
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating68.9 US tons
Inventory rating53.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length39 ft (11.9 m)
Longest span38 ft (11.6 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,056 (2024)
Projected traffic3,126 by 2032
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cito RD over Spring Run built?

It was built in 2018, making it 7 years old in 2025.

What condition is Cito RD over Spring Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Cito RD over Spring Run carry?

About 3,056 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is Cito RD over Spring Run?

The structure is 39 ft (11.9 m) long with a longest span of 38 ft (11.6 m) and a deck 30 ft wide.

Who owns Cito RD over Spring Run?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).