I-70 Wbl over T340 Fairview Road
FairFulton County, Pennsylvania · 1.5 Mile West of TR 731 · Structure no. 000000000017797
- Built
- 1962
- 63 years old, rebuilt 2011
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 6,085
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-70 Wbl over T340 Fairview Road is a prestressed concrete box beam or girders - multiple carrying I-70 Wbl over T340 Fairview Road in Fulton County, Pennsylvania. It was built in 1962 and reconstructed in 2011, so it is 63 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,085 vehicles a day, roughly 44% of them trucks, projected to reach 12,122 by 2032. The structure is 120 ft (36.6 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-70 Wbl over T340 Fairview Road built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2011.
What condition is I-70 Wbl over T340 Fairview Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does I-70 Wbl over T340 Fairview Road carry?
About 6,085 vehicles per day (2023 count), of which roughly 44% are trucks.
How long is I-70 Wbl over T340 Fairview Road?
The structure is 120 ft (36.6 m) long with a longest span of 43 ft (13.1 m) and a deck 46 ft wide.
Who owns I-70 Wbl over T340 Fairview Road?
It is owned by the State Highway Agency.