T-372 over Over S.Br. Tionesta Cr.
FairForest County, Pennsylvania · Howe Township · Structure no. 000000000017266
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected June 2023
- Type
- Slab
- Wood or Timber
- Length
- 36 ft
- 1 main span
- Daily traffic
- 25
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-372 over Over S.Br. Tionesta Cr. is a wood or timber slab carrying T-372 over Over S.Br. Tionesta Cr. in Forest County, Pennsylvania. It was built in 1992, so it is 33 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25 vehicles a day, roughly 3% of them trucks, projected to reach 35 by 2043. The structure is 36 ft (11 m) long and 20 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-372 over Over S.Br. Tionesta Cr. built?
It was built in 1992, making it 33 years old in 2025.
What condition is T-372 over Over S.Br. Tionesta Cr. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does T-372 over Over S.Br. Tionesta Cr. carry?
About 25 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is T-372 over Over S.Br. Tionesta Cr.?
The structure is 36 ft (11 m) long with a longest span of 34 ft (10.4 m) and a deck 20 ft wide.
Who owns T-372 over Over S.Br. Tionesta Cr.?
It is owned by the Town or Township Highway Agency.