Pa Tpk (toll 43) over Mon NS RR SR 4022 2026
FairFayette County, Pennsylvania · Over Monongahela River · Structure no. 000000000047878
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected April 2023
- Type
- Segmental Box Girder
- Concrete Continuous
- Length
- 3,029 ft
- 7 main spans
- Daily traffic
- 1,000
- 2012 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pa Tpk (toll 43) over Mon NS RR SR 4022 2026 is a concrete continuous segmental box girder carrying Pa Tpk (toll 43) over Mon NS RR SR 4022 2026 in Fayette County, Pennsylvania. It was built in 2012, so it is 13 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 12,000 by 2030. The structure is 3,029 ft (923.2 m) long and 89 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pa Tpk (toll 43) over Mon NS RR SR 4022 2026 built?
It was built in 2012, making it 13 years old in 2025.
What condition is Pa Tpk (toll 43) over Mon NS RR SR 4022 2026 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Pa Tpk (toll 43) over Mon NS RR SR 4022 2026 carry?
About 1,000 vehicles per day (2012 count), of which roughly 2% are trucks.
How long is Pa Tpk (toll 43) over Mon NS RR SR 4022 2026?
The structure is 3,029 ft (923.2 m) long with a longest span of 518 ft (157.9 m) and a deck 89 ft wide.
Who owns Pa Tpk (toll 43) over Mon NS RR SR 4022 2026?
It is owned by the State Toll Authority.