US Bridges

SR 3002 over Pa Tpk (toll 43)

Good

Fayette County, Pennsylvania · Near End of SR0043 · Structure no. 000000000041333

Built
1999
26 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
453 ft
2 main spans
Daily traffic
4,389
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 3002 over Pa Tpk (toll 43) is a steel continuous stringer/multi-beam or girder carrying SR 3002 over Pa Tpk (toll 43) in Fayette County, Pennsylvania. It was built in 1999, so it is 26 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,389 vehicles a day, roughly 22% of them trucks, projected to reach 3,593 by 2030. The structure is 453 ft (138.1 m) long and 55 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesSR 3002
CrossesPa Tpk (toll 43)
LocationNear End of SR0043
RouteState Highway 0
Coordinates39.74189, -79.81082
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating92 US tons
Inventory rating55 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length453 ft (138.1 m)
Longest span245 ft (74.7 m)
Deck width55 ft (16.9 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,389 (2024)
Projected traffic3,593 by 2030
Trucks22%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 3002 over Pa Tpk (toll 43) built?

It was built in 1999, making it 26 years old in 2025.

What condition is SR 3002 over Pa Tpk (toll 43) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR 3002 over Pa Tpk (toll 43) carry?

About 4,389 vehicles per day (2024 count), of which roughly 22% are trucks.

How long is SR 3002 over Pa Tpk (toll 43)?

The structure is 453 ft (138.1 m) long with a longest span of 245 ft (74.7 m) and a deck 55 ft wide.

Who owns SR 3002 over Pa Tpk (toll 43)?

It is owned by the State Toll Authority.