US Bridges

T-320 Huntley RD over Over SR 90 Eb/Wb

Good

Erie County, Pennsylvania · Springfield Township · Structure no. 000000000057444

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
191 ft
2 main spans
Daily traffic
151
2023 count
Owner
State
State Highway Agency

About this bridge

T-320 Huntley RD over Over SR 90 Eb/Wb is a prestressed concrete box beam or girders - multiple carrying T-320 Huntley RD over Over SR 90 Eb/Wb in Erie County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 151 vehicles a day, roughly 4% of them trucks, projected to reach 228 by 2032. The structure is 191 ft (58.2 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT-320 Huntley RD
CrossesOver SR 90 Eb/Wb
LocationSpringfield Township
RouteState Highway 0
Coordinates41.9432, -80.481
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length191 ft (58.2 m)
Longest span94 ft (28.7 m)
Deck width25 ft (7.7 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic151 (2023)
Projected traffic228 by 2032
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was T-320 Huntley RD over Over SR 90 Eb/Wb built?

It was built in 2019, making it 6 years old in 2025.

What condition is T-320 Huntley RD over Over SR 90 Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does T-320 Huntley RD over Over SR 90 Eb/Wb carry?

About 151 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is T-320 Huntley RD over Over SR 90 Eb/Wb?

The structure is 191 ft (58.2 m) long with a longest span of 94 ft (28.7 m) and a deck 25 ft wide.

Who owns T-320 Huntley RD over Over SR 90 Eb/Wb?

It is owned by the State Highway Agency.