US Bridges

Tannery Road over Over I-90/ Eb.W.B.

Good

Erie County, Pennsylvania · Girard Township · Structure no. 000000000044224

Built
2007
18 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
200 ft
2 main spans
Daily traffic
2,019
2024 count
Owner
State
State Highway Agency

About this bridge

Tannery Road over Over I-90/ Eb.W.B. is a prestressed concrete continuous box beam or girders - multiple carrying Tannery Road over Over I-90/ Eb.W.B. in Erie County, Pennsylvania. It was built in 2007, so it is 18 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,019 vehicles a day, roughly 5% of them trucks, projected to reach 1,764 by 2032. The structure is 200 ft (61 m) long and 33 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesTannery Road
CrossesOver I-90/ Eb.W.B.
LocationGirard Township
RouteState Highway 0
Coordinates41.99203, -80.26994
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length200 ft (61 m)
Longest span100 ft (30.5 m)
Deck width33 ft (10.2 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,019 (2024)
Projected traffic1,764 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Tannery Road over Over I-90/ Eb.W.B. built?

It was built in 2007, making it 18 years old in 2025.

What condition is Tannery Road over Over I-90/ Eb.W.B. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Tannery Road over Over I-90/ Eb.W.B. carry?

About 2,019 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Tannery Road over Over I-90/ Eb.W.B.?

The structure is 200 ft (61 m) long with a longest span of 100 ft (30.5 m) and a deck 33 ft wide.

Who owns Tannery Road over Over I-90/ Eb.W.B.?

It is owned by the State Highway Agency.