SR 79 NB over Over SR 3006 6N
GoodErie County, Pennsylvania · Washington Township · Structure no. 000000000040560
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 111 ft
- 1 main span
- Daily traffic
- 9,876
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 79 NB over Over SR 3006 6N is a prestressed concrete box beam or girders - multiple carrying SR 79 NB over Over SR 3006 6N in Erie County, Pennsylvania. It was built in 1999, so it is 26 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,876 vehicles a day, roughly 13% of them trucks, projected to reach 5,246 by 2032. The structure is 111 ft (33.8 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 79 NB over Over SR 3006 6N built?
It was built in 1999, making it 26 years old in 2025.
What condition is SR 79 NB over Over SR 3006 6N in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does SR 79 NB over Over SR 3006 6N carry?
About 9,876 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is SR 79 NB over Over SR 3006 6N?
The structure is 111 ft (33.8 m) long with a longest span of 105 ft (32 m) and a deck 44 ft wide.
Who owns SR 79 NB over Over SR 3006 6N?
It is owned by the State Highway Agency.