SR 8170 M Ricci WB over Over SR 90 Eb/Wb
GoodErie County, Pennsylvania · Greenfield Township · Structure no. 000000000016532
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 391 ft
- 2 main spans
- Daily traffic
- 4,416
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 8170 M Ricci WB over Over SR 90 Eb/Wb is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 8170 M Ricci WB over Over SR 90 Eb/Wb in Erie County, Pennsylvania. It was built in 1986, so it is 39 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,416 vehicles a day, roughly 7% of them trucks, projected to reach 4,816 by 2032. The structure is 391 ft (119.2 m) long and 45 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 8170 M Ricci WB over Over SR 90 Eb/Wb built?
It was built in 1986, making it 39 years old in 2025.
What condition is SR 8170 M Ricci WB over Over SR 90 Eb/Wb in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does SR 8170 M Ricci WB over Over SR 90 Eb/Wb carry?
About 4,416 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is SR 8170 M Ricci WB over Over SR 90 Eb/Wb?
The structure is 391 ft (119.2 m) long with a longest span of 135 ft (41.1 m) and a deck 45 ft wide.
Who owns SR 8170 M Ricci WB over Over SR 90 Eb/Wb?
It is owned by the State Highway Agency.