T-721 Raymond Road over W Br French Creek
FairErie County, Pennsylvania · 1/2 MI E of Ashton RD · Structure no. 000000000016432
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Wood or Timber
- Length
- 50 ft
- 2 main spans
- Daily traffic
- 57
- 2013 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-721 Raymond Road over W Br French Creek is a wood or timber slab carrying T-721 Raymond Road over W Br French Creek in Erie County, Pennsylvania. It was built in 1979, so it is 46 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 57 vehicles a day, roughly 3% of them trucks, projected to reach 62 by 2033. The structure is 50 ft (15.2 m) long and 26 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-721 Raymond Road over W Br French Creek built?
It was built in 1979, making it 46 years old in 2025.
What condition is T-721 Raymond Road over W Br French Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does T-721 Raymond Road over W Br French Creek carry?
About 57 vehicles per day (2013 count), of which roughly 3% are trucks.
How long is T-721 Raymond Road over W Br French Creek?
The structure is 50 ft (15.2 m) long with a longest span of 25 ft (7.6 m) and a deck 26 ft wide.
Who owns T-721 Raymond Road over W Br French Creek?
It is owned by the Town or Township Highway Agency.