SR 4013 Greenlee R over Over Elk Creek
GoodErie County, Pennsylvania · Mckean Township · Structure no. 000000000016378
- Built
- 1955
- 70 years old, rebuilt 2009
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 549
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 4013 Greenlee R over Over Elk Creek is a prestressed concrete box beam or girders - multiple carrying SR 4013 Greenlee R over Over Elk Creek in Erie County, Pennsylvania. It was built in 1955 and reconstructed in 2009, so it is 70 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 549 vehicles a day, roughly 5% of them trucks, projected to reach 580 by 2032. The structure is 32 ft (9.8 m) long and 27 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 4013 Greenlee R over Over Elk Creek built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 2009.
What condition is SR 4013 Greenlee R over Over Elk Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does SR 4013 Greenlee R over Over Elk Creek carry?
About 549 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is SR 4013 Greenlee R over Over Elk Creek?
The structure is 32 ft (9.8 m) long with a longest span of 30 ft (9.1 m) and a deck 27 ft wide.
Who owns SR 4013 Greenlee R over Over Elk Creek?
It is owned by the State Highway Agency.