SR 2025 Sciota RD over Over Hare Creek
FairErie County, Pennsylvania · City of Corry · Structure no. 000000000016276
- Built
- 1937
- 88 years old, rebuilt 1985
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 64 ft
- 1 main span
- Daily traffic
- 1,398
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2025 Sciota RD over Over Hare Creek is a steel stringer/multi-beam or girder carrying SR 2025 Sciota RD over Over Hare Creek in Erie County, Pennsylvania. It was built in 1937 and reconstructed in 1985, so it is 88 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,398 vehicles a day, roughly 4% of them trucks, projected to reach 1,175 by 2032. The structure is 64 ft (19.5 m) long and 28 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2025 Sciota RD over Over Hare Creek built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1985.
What condition is SR 2025 Sciota RD over Over Hare Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does SR 2025 Sciota RD over Over Hare Creek carry?
About 1,398 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is SR 2025 Sciota RD over Over Hare Creek?
The structure is 64 ft (19.5 m) long with a longest span of 62 ft (18.9 m) and a deck 28 ft wide.
Who owns SR 2025 Sciota RD over Over Hare Creek?
It is owned by the State Highway Agency.