US Bridges

SR 2008 Stone Qury over Over French Creek Trib

Fair

Erie County, Pennsylvania · Leboeuf Township · Structure no. 000000000016239

Built
1904
121 years old, rebuilt 2019
Condition
Fair
inspected November 2022
Type
Channel Beam
Concrete
Length
35 ft
1 main span
Daily traffic
213
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2008 Stone Qury over Over French Creek Trib is a concrete channel beam carrying SR 2008 Stone Qury over Over French Creek Trib in Erie County, Pennsylvania. It was built in 1904 and reconstructed in 2019, so it is 121 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 213 vehicles a day, roughly 6% of them trucks, projected to reach 186 by 2032. The structure is 35 ft (10.7 m) long and 27 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesSR 2008 Stone Qury
CrossesOver French Creek Trib
LocationLeboeuf Township
RouteState Highway 0
Coordinates41.8929, -79.93517
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionNovember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating105.1 US tons
Inventory rating63.1 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length35 ft (10.7 m)
Longest span35 ft (10.7 m)
Deck width27 ft (8.3 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic213 (2024)
Projected traffic186 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$39,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2008 Stone Qury over Over French Creek Trib built?

It was built in 1904, making it 121 years old in 2025. It was reconstructed in 2019.

What condition is SR 2008 Stone Qury over Over French Creek Trib in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.

How much traffic does SR 2008 Stone Qury over Over French Creek Trib carry?

About 213 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SR 2008 Stone Qury over Over French Creek Trib?

The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 27 ft wide.

Who owns SR 2008 Stone Qury over Over French Creek Trib?

It is owned by the State Highway Agency.