SR 2008 Stone Qury over Over French Creek Trib
FairErie County, Pennsylvania · Leboeuf Township · Structure no. 000000000016239
- Built
- 1904
- 121 years old, rebuilt 2019
- Condition
- Fair
- inspected November 2022
- Type
- Channel Beam
- Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 213
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2008 Stone Qury over Over French Creek Trib is a concrete channel beam carrying SR 2008 Stone Qury over Over French Creek Trib in Erie County, Pennsylvania. It was built in 1904 and reconstructed in 2019, so it is 121 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 213 vehicles a day, roughly 6% of them trucks, projected to reach 186 by 2032. The structure is 35 ft (10.7 m) long and 27 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2008 Stone Qury over Over French Creek Trib built?
It was built in 1904, making it 121 years old in 2025. It was reconstructed in 2019.
What condition is SR 2008 Stone Qury over Over French Creek Trib in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does SR 2008 Stone Qury over Over French Creek Trib carry?
About 213 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is SR 2008 Stone Qury over Over French Creek Trib?
The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 27 ft wide.
Who owns SR 2008 Stone Qury over Over French Creek Trib?
It is owned by the State Highway Agency.