T-578 Morehouse RD over Over SR 90 Eb/Wb
FairErie County, Pennsylvania · Greene Township · Structure no. 000000000016074
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 204 ft
- 4 main spans
- Daily traffic
- 700
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
T-578 Morehouse RD over Over SR 90 Eb/Wb is a prestressed concrete box beam or girders - multiple carrying T-578 Morehouse RD over Over SR 90 Eb/Wb in Erie County, Pennsylvania. It was built in 1959, so it is 66 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 700 vehicles a day, roughly 2% of them trucks, projected to reach 1,324 by 2032. The structure is 204 ft (62.2 m) long and 33 ft wide. If it were closed, the detour would be 24.9 mi (40 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-578 Morehouse RD over Over SR 90 Eb/Wb built?
It was built in 1959, making it 66 years old in 2025.
What condition is T-578 Morehouse RD over Over SR 90 Eb/Wb in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does T-578 Morehouse RD over Over SR 90 Eb/Wb carry?
About 700 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is T-578 Morehouse RD over Over SR 90 Eb/Wb?
The structure is 204 ft (62.2 m) long with a longest span of 64 ft (19.5 m) and a deck 33 ft wide.
Who owns T-578 Morehouse RD over Over SR 90 Eb/Wb?
It is owned by the State Highway Agency.