SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C
FairErie County, Pennsylvania · City of Erie · Structure no. 000000000015912
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 311 ft
- 4 main spans
- Daily traffic
- 8,417
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C is a steel continuous stringer/multi-beam or girder carrying SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C in Erie County, Pennsylvania. It was built in 1972, so it is 53 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,417 vehicles a day, roughly 3% of them trucks, projected to reach 10,923 by 2032. The structure is 311 ft (94.8 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C built?
It was built in 1972, making it 53 years old in 2025.
What condition is SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C carry?
About 8,417 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C?
The structure is 311 ft (94.8 m) long with a longest span of 101 ft (30.8 m) and a deck 44 ft wide.
Who owns SR 20 WB 26 TH ST over Over SR 79 Nb/Sb Ramp C?
It is owned by the State Highway Agency.